V-8 Engine Crank line: Flange face crank bolt alignment

Task:To align a dual cluster spindle head for 2 cranks being machined at the same time. Make dual master parts and adaptors for the spindles. We used existing cranks that ...

Read More

Draw Bridge shaft alignment

Task: To make sure the inboard and outboard bores are in-line with one another. Make legs to fit 36” diameter hole and set up for laser to pass through on ...

Read More

72 Meter Gantry Mill

Task: To check alignment, flatness, straightness, and parallelism of both X axis rails. Issues: The machine could not be run over 50% federate or it would fault out. What we ...